The run-in period of Industrial EOT Crane means that the new factory-installed Industrial EOT Crane should be operated according to the technical characteristics within a certain period when the cranes are initially used. The typical Industrial EOT Crane run-in period is 60h, but it depends on the crane type and brand.
The run-in period is a very important part for the Industrial EOT Crane, during the run-in period, in accordance with the provisions of the run-in, can ensure the normal operation of the machine, reduce the failure and extend the service life.
But some users, due to lack of common sense or tight schedules, want to put into production as soon as possible, full loading working without run-in period. This will make the Industrial EOT Crane appear more failure in earlier time, affecting operational efficiency, also shorten the service life.
And, some users think there is crane manufacturer warranty, the crane manufacturer will slove any problem, in fact, if the Industrial EOT Crane fails, will takes a lot of time to deal with, that will bring a lot of losses.
Therefore, crane customers should raise awareness of the use and maintenance of running-in period.
Related news
- Overhead bridge crane speed control
- Material lifting equipment inspection cycle
- Single Girder Overhead Cranes Delivery To F
- Overhead bridge crane grab classification
- Overhead crane lifting rule
- Explosion proof single girder overhead cran
- What are the overhead travelling crane brak
- Grab bucket overhead crane design
- Overhead bridge crane maintenance points
- LH double girder bridge crane for sale