> News >

Industrial workshop lifting bridge crane design

Jan 05, 2018
Lifting bridge crane is used for lifting heavy objects, different lifting bridge crane is different using scope, even for the same lifting equipment, also need to select the appropriate specifications, models. 
 
1. Meet the site operations
Lifting brideg crane is according to the working site operating conditions, such as the plant space, the span, etc.
And, need to consider the characteristics of materials, the weight, shape and size, should select lifting bridge crane with good performance, high cost performance and easy to maintenance.
 
2. Control costs
During the purchase, should take full account of how much need to put into the cost and how much can be obtained. The costs mainly include lifting bridge crane investment (including the related accessories, installation costs), operating expenses (including maintenance, labor costs, energy consumption, etc.), loading and unloading costs.
 
 
3. Crane related accessories
Lifting bridge crane related accessories refer to the appropriate specifications, parameters, the number.
 
single girder brideg crane

double girder bridge crane
Top